• -10%
  • New
AFK30 Clutch Slave Cylinder Ø 28.5 mm mineral oil Repair kit Ktm Supermoto 990 Smrsmt 2009+ CNC Raci

CNC Racing

Clutch Slave Cylinder Ø 28.5 mm mineral oil Repair kit Ktm Supermoto 990 Smrsmt 2009+ CNC Racing

-10% €48.31
Original Price: €53.68
VAT included (EU)

AFK30 Ktm Supermoto 990 Smrsmt 2009+
 

Only Certified Original products

 

Worldwide Shipping

 

No Customs Tax EU

Clutch Slave Cylinder Ø 28.5 mm mineral oil Repair kit Ktm Supermoto 990 Smrsmt 2009+ CNC Racing

Reference: AFK30

Brand: CNC Racing

Motorcycle brand: KTM

Motorcycle Model: Supermoto 990 Smrsmt

Motorcycle Year: 2009, 2010, 2011, 2012

Fascia Sconto: C

Make Model Bike Year: KTM Supermoto 990 Smrsmt 2009+

MY: 2009+

CNC Racing • 842778



Repair kit for our KTM 28,5 mm clutch slave cylinders which use the Mineral Oil (AF310).

It is advisable to have the replacement performed by specialized workshop.