• -10%
  • New
PL118 Adapter to install brake and clutch lever protection. Aprilia Tuono 660 Factory 2022+ CNC Raci
PL118 Adapter to install brake and clutch lever protection. Aprilia Tuono 660 Factory 2022+ CNC Raci
PL118 Adapter to install brake and clutch lever protection. Aprilia Tuono 660 Factory 2022+ CNC Raci
PL118 Adapter to install brake and clutch lever protection. Aprilia Tuono 660 Factory 2022+ CNC Raci

CNC Racing

Adapter to install brake and clutch lever protection. Aprilia Tuono 660 Factory 2022+ CNC Racing

-10% €20.31
Original Price: €22.57
VAT included (EU)

PL118 Aprilia Tuono 660 Factory 2022+
 

Only Certified Original products

 

Worldwide Shipping

 

No Customs Tax EU

Adapter to install brake and clutch lever protection. Aprilia Tuono 660 Factory 2022+ CNC Racing

Reference: PL118

Brand: CNC Racing

Motorcycle brand: Aprilia

Motorcycle Model: Tuono 660 Factory

Motorcycle Year: 2022, 2023

Fascia Sconto: C

Make Model Bike Year: Aprilia Tuono 660 Factory 2022+

MY: 2022+

CNC Racing • 844494



Adapter to mount the front brake and clutch lever guards.
Made from solid aluminum alloy with steel screw, it allows a plug & play assembly of our front brake and clutch lever guards.
It can be applied both to the original Ducati handlebar clip-on with thread and to our handlebar clip-on.
Each adapter can be used to mount a brake or clutch lever guard.