• -10%
  • New
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci
SM553 Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Raci

CNC Racing

Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Racing

-10% €230.58
Original Price: €256.20
VAT included (EU)

SM553 Ducati Superbike 848 Evo Corse 2012+
 

Only Certified Original products

 

Worldwide Shipping

 

No Customs Tax EU

Clip on clamps kit Ø 53 mm offset 26 mm angle 7° Ducati Superbike 848 Evo Corse 2012+ CNC Racing

Reference: SM553

Brand: CNC Racing

Motorcycle brand: Ducati

Motorcycle Model: Superbike EVO 848 Corse

Motorcycle Year: 2012, 2013

Fascia Sconto: C

Make Model Bike Year: Ducati Superbike EVO 848 Corse 2012+

MY: 2012+

CNC Racing • 841437



Pair of clip-on handlebar clamps for 53 mm fork tubes, developed to enhance control and riding precision during both sporty road riding and track use. The components are manufactured from solid billet aluminum through CNC machining, ensuring excellent dimensional accuracy, reduced weight, and high structural rigidity.
The billet construction guarantees outstanding resistance to the stresses generated during aggressive riding conditions, contributing to improved front-end stability, steering response, and precision when entering corners. The optimized design helps deliver a more direct riding feel and greater control during dynamic riding.
The components feature a durable surface anodized finish, designed to protect the aluminum from oxidation, wear, and environmental exposure while maintaining a refined technical appearance that integrates perfectly with modern supersport and racing motorcycles.
The clamp geometry ensures accurate installation on 53 mm fork tubes, while the 7° handlebar inclination promotes a sporty riding position designed to maximize rider feedback and control.
The kit includes high-strength steel fastening screws to provide secure and reliable installation.

 

Main features

  • CNC-machined clip-on clamps manufactured from solid billet aluminum
  • Designed for motorcycles with 53 mm fork tube diameter
  • Lightweight and high-strength aluminum construction
  • Anodized surface finish for increased durability and corrosion resistance
  • Engineered to improve steering precision and front-end feedback
  • Sport and racing inspired design suitable for supersport motorcycles
  • High-strength steel hardware included

 

Technical specifications

  • Handlebar inclination: 7°
  • Fork tube diameter: 53 mm
  • Offset: 26 mm
  • Clamp height: 30 mm

 

Components required for installation

To complete the installation, the following parts must be purchased separately:

  • CNC Racing handlebar tubes available in the following lengths:
    260 mm – code SMT60B (usable length 230 mm)
    275 mm – code SMT75B (usable length 245 mm)